Skip to content
Renovanto - Precision PV Design

NEC 2023 · All 50 states

Permit-Ready Solar Plan Sets. Delivered in 48 Hours.

Renovanto delivers NEC 2023-compliant PV design, permitting, and BESS engineering for US installers — built to cut your drafting overhead without adding headcount.

What we need to quote

  • System size (kW / MW)
  • Site address
  • Utility
  • Equipment list
  • Roof / site photos
  • Redlines or prior drawings
300+
North American projects delivered by our founding team
0+
EPC projects managed by our founder
100 kW–5 MW
Project size range
0-hr
Standard turnaround
BESSGRID

Tools we master

  • AutoCAD
  • PVsyst
  • HelioScope
  • Aurora
  • ETAP
  • EasyPower
  • SketchUp
  • Solar Pro Tool
  • DIALux
  • AutoCAD
  • PVsyst
  • HelioScope
  • Aurora
  • ETAP
  • EasyPower
  • SketchUp
  • Solar Pro Tool
  • DIALux

Services

Six deliverables, one engineering team. Every drawing is reviewed by people who have managed real construction, not just drafted it.

10% Design & Proposal Modeling

10% preliminary engineering, PVsyst energy yield simulation, and Aurora/HelioScope sales proposals with production estimates your team can count on.

  • 10% schematic layouts & SLD drafts
  • PVsyst production & loss tree modeling
  • Aurora & HelioScope sales proposals

Permit Plan Sets

AHJ-specific residential and commercial plan sets built to NEC 2023 — cover sheet through placards, ready to submit.

  • Site plan, layout, SLD, three-line
  • Attachment and racking details
  • AHJ checklist matched

PE Review & Stamps

Structural and electrical PE stamps across all 50 states, coordinated through licensed partner engineers.

  • Structural letters
  • Electrical review
  • State-by-state coordination

Utility Interconnection Packages

SLDs, three-line diagrams, and application support built to the utility's own submission format.

  • Utility-specific forms
  • Equipment cut sheets
  • Resubmittal support

As-Built Drawings

Fast redline-to-final conversion so closeout never holds up your final inspection or funding.

  • Field redline markup
  • Revision clouds
  • 24–48 hour returns
Specialty

Hybrid PV + BESS Design

Battery sizing, backup and load analysis, and NEC 705/706-compliant drawings — our specialty discipline.

  • Load and backup analysis
  • NEC 705/706 compliance
  • Partial-home backup schemes
What You'll Actually Get

Real engineering deliverables, not just tool names

Explore the exact native outputs, simulation reports, and CAD plan sets our team builds and delivers daily.

AutoCAD • PVsyst • HelioScope • Aurora Solar
AutoCAD Deliverable Output Preview
NEC 2023 Compliant
AutoCAD output preview
Permit & SLD Drafting

Full Multi-Sheet Permit Sets & Electrical Schematics

Every plan set is drafted in native AutoCAD (.DWG) to precision CAD standards. Includes title blocks, roof layout, stringing, conduit runs, equipment schedules, and code-compliant single-line/three-line diagrams.

What this deliverable includes:

  • Layer-standardized .DWG & vector PDF deliverables
  • Exact conduit fill, wire sizing, and OCPD specifications
  • Custom title blocks with your company branding
  • Ready for direct AHJ submission & electrician install
Simple 4-Step Execution

How a project runs

From raw project specs to permit-approved drawings — zero onboarding friction, native files included.

Average turnaround: 24–48 hours
STEP 01
5-min intake
Zero Onboarding Friction

Send project details

Email us the site address, utility, equipment list, and any photos or redlines. No portal logins, no onboarding calls, no mandatory formats.

  • Site address & utility jurisdiction
  • Equipment BOM / preferred specs
  • Photos or rough sketch redlines
STEP 02
24–48h delivery
Two-Stage Engineering Review

We design & QA

Our drafting team builds the set in AutoCAD; a second senior engineer runs a two-stage QC pass against the AHJ checklist and NEC 2023.

  • NEC 2023 code validation
  • 705.12 busbar & conductor sizing
  • Independent senior engineer QC pass
STEP 03
Free revisions
Native DWG + PDF Deliverables

You review & markup

You get the full vector PDF and editable native CAD files. Mark it up with any field adjustments — revisions are free until the set matches your exact specs.

  • Permit-ready vector PDF
  • Editable AutoCAD .DWG files
  • Unlimited revisions on agreed scope
STEP 04
Same-day corrections
AHJ Clearance & PE Stamps

Permit approved

Submit with total confidence. If the AHJ comes back with comments, we turn corrections around same day. Structural and electrical PE stamps coordinated across all 50 states.

  • Same-day AHJ comment turnaround
  • 50-state PE stamp coordination
  • Final as-built redlines for closeout

Need an urgent permit set or custom commercial proposal turnaround?

We offer guaranteed 24-hour rush turnaround with dedicated PE stamp coordination.

Start a Project

Why Renovanto

Renovanto takes its name from the Latin renovare — to renew. The work behind the name is unglamorous: precise drawings, checked twice, delivered on time.

25+ years designing exclusively for North American AHJs and utilities

NEC 2020/2023 and IFC/IBC compliance built into every drawing

EPC-grade quality: reviewed by a team that has managed real construction

48-hour standard turnaround, 24-hour rush available

White-label: we work under your brand, NDA on request

Designed to reduce drafting overhead without adding in-house headcount

BESSGRID

Pricing

Per-deliverable pricing. No retainers, no seat licences, no minimum volume.

Starter

from $40 / design

10% preliminary designs and proposal modeling for sales teams needing speed and precision.

  • 10% schematic design & layout
  • PVsyst, Aurora or HelioScope model
  • Production estimate + shade report
  • Branded PDF deliverable
  • 24-hour standard return
Start with a proposal
Most popular

Professional

from $99 / plan set

Residential permit plan sets, AHJ-matched and NEC 2023-compliant. Base rate for a standard roof — complex roofs, ground-mounts, utility-specific interconnection packages and PE stamps are quoted on top.

  • Full permit-ready plan set
  • AHJ-specific checklist review
  • Free revisions until approval
  • 48-hour standard delivery
  • 24-hour rush available
Get a plan set quote

Enterprise

Custom $ / kW

Commercial, ground-mount, and hybrid PV + BESS programs with a dedicated engineer.

  • Dedicated engineer + priority queue
  • Commercial & ground-mount sets
  • PV + BESS design (NEC 705/706)
  • Interconnection packages
  • White-label, NDA on request
Talk to engineering

PE stamps quoted per state via our licensed partners.

Selected work

Anonymised project scopes and aerial installation views from the founding team's North American portfolio.

Permit approved across 50 US States
2.5 MW ground-mount — Texas
2.5 MW DC
Travis County, TX
Single-Axis Tracker Ground Mount

2.5 MW ground-mount — Texas

Full permit package and utility interconnection application for a 2.5 MW single-axis tracker site, approved on first submission with zero comments.

  • Permit set
  • Interconnection
  • PE coordination
5 MW rooftop — California
5.0 MW DC
Inland Empire, CA
Commercial Rooftop Array

5 MW rooftop — California

Design through commissioning support on a massive multi-building rooftop logistics array, coordinated with the structural engineer of record.

  • Design
  • Structural review
  • Commissioning support
480 kW carport + BESS — Arizona
480 kW + 250 kWh BESS
Maricopa County, AZ
Solar Carport + Storage

480 kW carport + BESS — Arizona

Hybrid carport canopy with a 250 kWh modular storage block, load analysis, and utility-format three-line diagrams.

  • PV + BESS
  • NEC 705/706
  • Three-line
9.8 kW residential retrofit — Florida
9.8 kW DC
Palm Beach County, FL
Residential Tile Roof (HVHZ)

9.8 kW residential retrofit — Florida

High-Velocity Hurricane Zone residential set with 175 mph wind-load attachment details and same-day AHJ review clearance.

  • Permit set
  • Wind load
  • AHJ revisions
180 kW commercial rooftop — New Jersey
180 kW DC
Bergen County, NJ
Ballasted Commercial Flat Roof

180 kW commercial rooftop — New Jersey

Ballasted commercial rooftop with utility application support, ASCE 7-22 roof-loading calculations, and PE stamp coordination.

  • Permit set
  • Interconnection
  • ASCE 7-22
22 kW + backup — Colorado
22 kW + Whole-Home BESS
Boulder County, CO
Residential Metal Roof + BESS

22 kW + backup — Colorado

Whole-home battery backup design with critical-load panel schedules, standing seam attachments, and post-install as-built conversion.

  • PV + BESS
  • Backup loads
  • As-builts
Standard Deliverable Structure

What a Renovanto set contains

Every permit set we deliver carries a standardized sheet structure, ensuring your local AHJ reviewer and utility inspector sees a clean, compliant document every time.

1
Cover sheetScope, code cycle, sheet index, equipment schedule, governing codes & site location map
2
Site planOverall site layout, property lines, equipment location, array installation area, system info, point of interconnection
3
Roof plan & layoutModule placement, string layout, attachment spacing, roof dimensions & structural framing
4
Single-line & three-line diagramsConductor sizing, OCPD, disconnect ratings, rapid shutdown initiation, NEC 705.12 calculation
5
Structural detailsRacking system, roof attachments, fastener specs, uplift/pull-out values, wind & snow loading
6
Placard scheduleNEC 690.56 / 705 safety & hazard labelling, directory maps, placed to code

Get the 2026 Solar Permit Checklist

Our comprehensive AHJ-by-AHJ permit checklist, sent directly to your inbox. We'll also send the redacted sample plan set — drawn from scratch to showcase our exact drafting standards.

What's included in the checklist:

  • NEC 2023 690.12 rapid shutdown initiation requirements
  • 705.12 busbar & conductor calculation validation matrix
  • State-by-state structural ASCE 7-22 wind & snow load thresholds

Frequently asked

48 hours for residential permit plan sets and 24 hours for proposal designs. A 24-hour rush option is available on request, and commercial timelines are quoted per project.

All 50 US states. We keep AHJ-specific checklists for the jurisdictions we work in most and build a new checklist from the AHJ's published requirements the first time you send us a new one.

NEC 2023 by default, NEC 2020 where the AHJ has not yet adopted 2023. Rapid shutdown, conductor sizing, and labeling are matched to the adopted code cycle.

We coordinate structural and electrical stamps through licensed partner engineers in the state of the project. Stamps are quoted per state and billed at cost plus coordination.

Yes. White-label is standard: your title block, your logo, your revision conventions. We sign an NDA on request before the first file is exchanged.

Invoiced in USD, payable by Wise or wire. New clients start prepaid per project; ongoing accounts move to net-15 billing after the first month.

Free revisions on the agreed scope until the set is approved. AHJ comments on our work are corrected at no charge, same day where possible.

Files are stored on access-controlled cloud storage, shared only with the engineers on your project, and deleted on request at project close. NDAs are signed on request.

Send specs tonight. Review the set tomorrow.

Response within 4 business hours. First plan set at 50% off — free if we miss the 48-hour deadline.