2.5 MW ground-mount — Texas
Full permit package and utility interconnection application for a 2.5 MW single-axis tracker site, approved on first submission with zero comments.
- Permit set
- Interconnection
- PE coordination
Work
Anonymised for client confidentiality. Scope, size and jurisdiction are real.
Anonymised project scopes and aerial installation views from the founding team's North American portfolio.

Full permit package and utility interconnection application for a 2.5 MW single-axis tracker site, approved on first submission with zero comments.

Design through commissioning support on a massive multi-building rooftop logistics array, coordinated with the structural engineer of record.

Hybrid carport canopy with a 250 kWh modular storage block, load analysis, and utility-format three-line diagrams.

High-Velocity Hurricane Zone residential set with 175 mph wind-load attachment details and same-day AHJ review clearance.

Ballasted commercial rooftop with utility application support, ASCE 7-22 roof-loading calculations, and PE stamp coordination.

Whole-home battery backup design with critical-load panel schedules, standing seam attachments, and post-install as-built conversion.
Every permit set we deliver carries a standardized sheet structure, ensuring your local AHJ reviewer and utility inspector sees a clean, compliant document every time.
Our comprehensive AHJ-by-AHJ permit checklist, sent directly to your inbox. We'll also send the redacted sample plan set — drawn from scratch to showcase our exact drafting standards.
What's included in the checklist:
Explore the exact native outputs, simulation reports, and CAD plan sets our team builds and delivers daily.

Every plan set is drafted in native AutoCAD (.DWG) to precision CAD standards. Includes title blocks, roof layout, stringing, conduit runs, equipment schedules, and code-compliant single-line/three-line diagrams.
In-depth project breakdown, engineering challenges solved, and AHJ approval milestones.
Case study 01Challenge: Challenging terrain requiring customized pile embedment calculations, steep slope conductor sizing, and full utility three-line diagrams with transfer trip protection specs.
Outcome: 100% first-pass approval from Travis County and Oncor with zero comments or design revisions, enabling on-schedule civil mobilization.
Case study 02Challenge: Tight structural dead-load constraints on an aging TPO membrane roof, requiring ASCE 7-22 25 psf snow load distribution and NJ UCC fire setback compliance.
Outcome: Structural PE stamp secured in 24 hours; ballasted layout approved by local code official on initial submission.
Case study 03Challenge: Complex NEC 706 energy storage disconnecting means, high-temperature ampacity deratings (122°F ambient), and APS peak-demand shaving tariff compliance.
Outcome: Complete electrical and structural permit set cleared APS review on the first round with full compliance verified.